5.2. Assembly-Placement
The operator must check the following:
• That the place is prepared for the machine's installation.
• That the surface for the machine's installation is hard, flat and
firm.
• That the area has sufficient lighting, ventilation and hygiene,
with easy access to the power supply.
The machine's access areas must remain
clear to enable the operator to intervene
without obstruction and to enable the quick
evacuation of the work area if necessary.
The minimum required spaces are described as follows.
After having placed the package near the installation area
proceed as follows:
1. Cut the strips that hold the packaging in place.
2. Lift the cardboard packaging.
3. Then place the machine in the prepared
area.
Before starting the machine for the first time,
its components must be cleaned and parts
that come into contact with the product must
be sanitized; for further information please
consult the corresponding section.
5.3. Package disposal
Once the packaging is opened it is advisable to separate it into
types of material and to dispose of it according to the
applicable regulations in the country of use. It is advisable to
keep the packaging for later movements or transport.
5.4. Electrical connection
This operation should only be performed by
specialized technical personnel.
The customer is solely responsible for the machine's electrical
connection.
The machine should be connected to the electrical network
using the plug that is on its electrical cable, considering:
• The applicable laws and regulations at the time of the
installation.
• The data indicated on the technical detail plate which is fixed
to the side of the machine.
SL320003270 Ed 03_EN
Warning: the connection point to the power
supply must be of easy access to the user, to
ensure that the machine can be easily
disconnected from the power supply if
necessary.
If the power supply cable is damaged only contact the
manufacturer or a specialized technician for its replacement.
It is forbidden to:
• Use any kind of extension lead.
• Replace the original plug.
• Use adaptors.
6. OPERATION
Before turning on the machine for the first time, its proper
installation must be verified by a specialized technician.
Close the pump cover and perform the pump
tube running in before the first use of the
machine (see cap. 7.6)
6.1 Product preparation
Prepare the product in a container according to the
manufacturer's instructions.
Pour the product into the tank which is located inside of the
fridge. Add a maximum of 5 L of produce. Once the product
has been poured into the tank, close it using the corresponding
lid.
10