Commissioning; General Requirements - Siemens SITRANS FUT1010 IP65 NEMA 4X 7ME363 Inicio Rápido

Ocultar thumbs Ver también para SITRANS FUT1010 IP65 NEMA 4X 7ME363:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Commissioning

4.1

General requirements

Before commissioning it must be checked that:
● The device has been installed and connected in accordance with the guidelines provided
● Device installed in hazardous location meets the requirements described in chapter 1
4.2
Commissioning
Electrical Shock Hazard
Certain parts inside the device carry dangerous high voltage and will result in death or
serious injury.
The transmitter must be grounded and the top cover closed before switching the device on.
Turn off main power before installing AC connections to the transmitter.
Power Supply Damage
Improper power connections will damage power supply and may result in death or serious
injury.
Ensure that all AC or DC power supply connections are properly connected to the
appropriate power source (100-250 VAC @ 50/60 Hz or 9-36 VDC).
FUT1010 IP65 NEMA 4X & IP66 NEMA 7 Gas Quick Start
Operating Instructions, 1/2013, A5E02639183-AC
in chapter 2 Installing/mounting (Page 13) and 3 Connecting (Page 23).
Safety Notes (Page 6).
DANGER
WARNING
4
35

Publicidad

Tabla de contenido

Solución de problemas

loading

Este manual también es adecuado para:

Sitrans fut1010 ip66 nema 7 7me363

Tabla de contenido