1. Remove four (4) #10 bolts securing Junction Box top cover. Remove cover and set aside
2. Observing the upstream to downstream orientation, pull Channel-1 and Channel-2 UP
FUT1010 IP65 NEMA 4X & IP66 NEMA 7 Gas Quick Start
Operating Instructions, 1/2013, A5E02639183-AC
bolts.
①
CH 4-Sensor to Junction Box Gland
②
CH 3-Sensor to Junction Box Gland
③
Top Cover #10 bolts (4)
④
Temperature Sensor Terminal Board
TB1
⑤
CH 2-Sensor to Junction Box Gland
⑥
Transducer Channel F-Connectors
⑦
Junction Box without top cover
⑧
CH4 - DN to Transmitter
Figure 3-6
Sensor Cable Installation
and DN Sensor cables into the corresponding CH-1 and CH-2 Junction Box glands.
NOTICE
Incorrect Bend Radius
If bend radius is incorrect damage to cables may result.
When connecting sensor cables inside Junction Box cable bend radius should not
exceed bend tighter than 8 cm (3 in.).
⑨
CH 4 - UP to Transmitter
⑩
CH 2 - DN to Transmitter
⑪
CH 2 - UP to Transmitter
⑫
Temperature Sensor Gland
⑬
CH 1 - DN to Transmitter
⑭
CH 1 - UP to Transmitter
⑮
CH 3 - DN to Transmitter
⑯
CH 3 UP to Transmitter
⑰
CH 1-Sensor to Junction Box Gland
Connecting
3.2 Sensor Wiring
31