Commissioning - Siemens SITRANS F FST020 IP65 NEMA 4X Instrucciones De Servicio

Caudalímetros ultrasónicos
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Commissioning

4.1
Commissioning
1. Scroll down to [Install Complete]. Press the <Right Arrow> key.
2. Press the <Down Arrow> key and select [Install].
3. Press <ENTER> key. The flow meter will go through drives.
4. Observe the Measured Vs window and verify a correct sound velocity measurement (if
5. Press the <Down Arrow> key to accept sound velocity value. Auto Zero will follow.
6. The flow meter is now ready to report flow.
FST020 IP65 NEMA 4X Quick Start
Operating Instructions, 08/2014, A5E03086489-AJ
known).
Select [Install].
Note
Save and Rename Procedure
Whenever new site configurations are added to an existing site that site must be saved
again to retain the new site changes.
1. To save all programmed data to site, press <Left Arrow> key and then scroll up to
[Channel Setup].
2. Press <Right Arrow> key and scroll to [Save/Rename Site].
3. Press <Right Arrow> key and then <ENTER> to save all programmed data to site.
4. To return to the top menu level, continue to press the <Left Arrow> key
4