Prepare the test gas supply:
1. Connect the calibration adapter (Fig. G 2) and test gas cylinder (Fig. G 4) to
the tube (Fig. G 3).
2. To discharge the test gas, connect a hose to the second connector on the
calibration adapter.
3. Attach the calibration adapter to the sensor (Fig. G 1).
10.3
Zero adjustment
For O
sensors, only checking the zero point (no adjustment) is done when
2
nitrogen is applied to the sensor. The gas detector indicates an error condition if
0.6 Vol% O
is not undershot. In the event of an error, repeat the zero
2
adjustment or change the sensor.
10.4
Carrying out the zero adjustment
Prerequisites:
–
Warm-up phases 1 and 2 completed
–
The test gas supply has been prepared.
–
A connection between the gas detector and PolySoft has been established.
11
Troubleshooting
Instructions for use
|
Dräger Polytron
®
6100 EC WL, Dräger Polytron
Carrying out the zero adjustment:
1. Start the zero adjustment in PolySoft.
™
ISA100 Wireless
interface transmits the measured value status "Bad,"
(substatus maintenance mode active).
2. Follow the instructions of the wizard In PolySoft.
Flow with test gas supply: 0.5 L/min ± 10 %
3. After completion of the zero point adjustment, switch off the gas flow and
remove the calibration adapter.
10.5
Carrying out the span calibration
Prerequisites:
–
Zero point adjustment has been carried out.
–
The test gas supply has been prepared.
–
A connection between the gas detector and PolySoft has been established.
Carrying out the span calibration:
1. Start and confirm span calibration in PolySoft.
™
ISA100 Wireless
interface transmits the measured value status "Bad,"
(substatus maintenance mode active).
2. Follow the instructions of the wizard In PolySoft.
Flow with test gas supply: 0.5 L/min ± 10 %
3. After completion of the span calibration, switch off the gas flow and remove
the calibration adapter.
®
Repeater ISA
|
en
Troubleshooting
43