Connecting The Control Lead; Setting The Shielding Gas Quantity; Introducing The Wire - Abicor Binzel ABIROB W Serie Traducción Del Manual De Instrucciones Original

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

6 Putting into operation

6.6 Connecting the control lead

On the torch side
Emergency Stop 2
Emergency Stop 3
Emergency Stop 1
Gas nozzle sensor
insulated
Wire feeder
Wire feeder
Fig. 8
Connecting the control lead

6.7 Setting the shielding gas quantity

6.8 Introducing the wire

EN - 14
3 Switch off the re-circulating cooling unit and reconnect the coolant return
hose (4).
Control lead with 3-pin plug
101.0140
WH
BN
GN
NOTICE
• The type and quantity of the shielding gas quantity depends on the
welding task and the gas nozzle geometry.
• To prevent the shielding gas supply from becoming clogged by
impurities, the cylinder valve must be opened briefly, before connecting
the cylinder. This will blow out any impurities that may be present.
• Make all shielding gas connections gas-tight.
1 Connect shielding gas cylinder to the wire feeding system.
2 Set the gas quantity on the pressure reducer of the shielding gas cylinder.
NOTICE
• Each time the wire is changed, make sure that the beginning of the wire is
free of burrs.
1 Insert the wire in the wire feed unit as specified by the manufacturer.
2 Press the "Current free wire feed" pushbutton at the wire feed unit.
®
ABIROB
Control lead 7-wire
100.0084
WH
BN
GN
YE
GY
BU
PK
W

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Abirob w300Abirob w500Abirob w50Abirob w600

Tabla de contenido