Delivery Status - Conergy IPG Serie Instrucciones De Servicio

Ocultar thumbs Ver también para IPG Serie:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

4 Transportation and assembly
4.3
24
> 1500 mm
4–2:
Transportation rails and centre of gravity for the hanger assembly
Damage due to condensate
If the device is moved from a cold environment to an operating
area, condense water may form, causing damage to the electronic
equipment.
| Before commissioning, the device must be absolutely dry.
| During transportation, do not subject the device to high
temperature fluctuations or particularly high levels of air
humidity.
| Observe a minimum waiting time of 2 hours between installation
at the operating site and commissioning.

Delivery status

The central inverter was tested before delivery and is ready for
operation. The devices are set to the applicable standard values in
Germany for voltage limits and grid frequencies at the factory.
In cases of divergent grid characteristics, it may be necessary to
change the standard settings of the DIP switches
(see Chapter 5.1.6, page 37).
The values for voltage limits and grid frequencies may only be set
in consultation with the appropriate energy supply company (ESC).
Unauthorised changes to the settings may lead to malfunctions,
losses in yield or to loss of feed-in licence.
Operating manual
???????????
Conergy IPG series central inverters
(1)

Hide quick links:

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Ipg 40kIpg 60kIpg 80kIpg 100kIpg 110kIpg 280k ... Mostrar todo

Tabla de contenido