Conergy IPG Serie Instrucciones De Servicio página 86

Ocultar thumbs Ver también para IPG Serie:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

NOTICE
Result
Conergy IPG series central inverters
Damage due to loose screw connections!
If the securing nuts are not tightened to the specified torques, the
screws may become loose as a consequence of the vibration
produced by the terminal blocks.
Loosened screw connections change the resistance and the
conductivity at the connection. Operation of the central inverter
can be adversely affected and it may suffer damage.
| Before commissioning, check that all screw connections are
tightened to the correct torque and retighten where necessary.
Thread size
Tightening torque (Nm)
M8
27
M10
54
M12
93
L3
PE
8. Tighten the securing nut.
9. Fit the Plexiglas cover.
10. Screw the Plexiglas cover in place.
11. Close the front door.
The solar generator is connected.
Connecting the grid
Connecting the grid
1. Open the front door
2. Unscrew the lower Plexiglas cover.
3. Remove the lower Plexiglas cover.
4. Check the AC cable leads.
An incorrect rotary field will not be connected to the public grid.
Conergy IPG series central inverters therefore only switch on with a
clockwise rotary field.
| Check the direction of the rotary field (see Chapter 5.2, page 39).
Operating manual
5 Installation
Strength category
8.8
+
33

Hide quick links:

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Ipg 40kIpg 60kIpg 80kIpg 100kIpg 110kIpg 280k ... Mostrar todo

Tabla de contenido