Checks; Chimney Sweeper Function - Sime BRAVA SLIM HE ErP Serie Manual De Instalation Y Mantenimiento

Calderas murales de condensación
Ocultar thumbs Ver también para BRAVA SLIM HE ErP Serie:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

TABLE OF COUNTER DISPLAYED
Type
No.
Description
total no. of boiler
PAR
c0
operating hours
total no. of burner
PAR
c1
operating hours
total no. of burner
PAR
c2
ignitions
PAR
c3
total no. faults
total no. of times
PAR
c4
installer parameters
"ALL"accessed
total no. of times
PAR
c5
OEM parameters
accessed
time unitl next
PAR
c6
maintenance
intervention
total no. of
PAR
c7
calibrations
TABLE OF ACTIVATED ALARMS/FAULTS
Type
No.
Description
PAR
A0
Last activated alarm/fault
PAR
A1
Last but one activated alarm/fault
PAR
A2
Third from last activated alarm/fault
PAR
A3
Previous activated alarm/fault
PAR
A4
Previous activated alarm/fault
PAR
A5
Previous activated alarm/fault
PAR
A6
Previous activated alarm/fault
PAR
A7
Previous activated alarm/fault
PAR
A8
Previous activated alarm/fault
PAR
A9
Previous activated alarm/fault
3.6

Checks

3.6.1

Chimney sweeper function

The chimney sweeper function is used by the qualified
maintenance technician to check the mains gas pressure, detect
the combustion parameters and to measure the combustion
efficiency required by legislation in force.
This function lasts 15 minutes and is activated by proceeding
as follows:
– if the panel (2) has not already been removed, remove the
two screws (1), pull the front panel (2) forwards and release it
from the top by lifting it
2
86
Range
U/M
Step
0.1; from
0 ..
0.0 to 9.9;
h x 1000
99
1; from 10
to 99
0.1; from
0 ..
0.0 to 9.9;
h x 1000
99
1; from 10
to 99
0.1; from
0 ..
0.0 to 9.9;
h x 1000
99
1; from 10
to 99
0 ..
x 1
1
99
0 ..
x 1
1
99
0 ..
x 1
1
99
1 ..
months
1
199
1 ..
x 1
1
199
1
Fig. 33
– remove the screws (3) securing the control panel (4)
– move the panel (4) upwards (a) but keeping it in the side
guides (5) to the end of travel
– bring it forwards and down (b) until it is horizontal
4
b
3
– close the gas valve
– loosen the screw of the "mains pressure" point (6) and connect
a pressure gauge
– open the gas valve
– power the boiler by setting the main switch to "ON"
ON
EN
a
5
Fig. 34
6
Fig. 35
Fig. 36

Publicidad

Tabla de contenido
loading

Tabla de contenido