Installation Steps; Dome Thermometer & Smoke Stack - Pit Boss PB820FBC Instrucciones Y Recetas

Plancha enchapada
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

INSTALLATION STEPS

Insert one screw (A) from inside the lid, through the hole
provided in the lid.
Place one bezel (6) over the screw, then lin-up the handle (5)
with the threaded end of the screw.
Hand start the screw into the handle
Repeat procedure for other end of handle
Using your wrench securely tighten ALL screws (A)
ASSEMBLING THE DOME
THERMOMETER
Parts Needed:
7 - Dome Thermometer
INSTALLATION STEPS
The thermometer comes complete with its own threaded nut
already installed on the thermometer.
Simply spin off the threaded nut, and insert the thermometer
through the hole provided in the top of the hood. Firmly hand
tighten the nut back onto the thermometer.
All manuals and user guides at all-guides.com
Note: Take care not to turn the face of the thermometer. This will
result in incorrect readings.
ATTACHING THE SMOKE STACK
Parts Needed:
17 - Smoke Stack
- Smoke Stack Gasket
Hardware Required:
INSTALLATION STEPS
Note: DO NOT lower the chimney cap tight to the chimney stack. You
must allow air to escape.
Screw 1/4" - 20* 3/5" x2 (AA)
Using the 2 screws (AA) insert those through the stack section,
through the gasket, then finally through the barrel end.
Hand start, then secure in place using your Phillips Screwdriver
9

Publicidad

Tabla de contenido

Solución de problemas

loading

Este manual también es adecuado para:

1031587

Tabla de contenido