Accu-Chek Performa Instrucciones De Uso página 46

Ocultar thumbs Ver también para Performa:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

306_33481_PerfManLAapacEN.qxp
6. Put the meter on a flat surface, and then align the infrared windows on the meter and
cable or PDA (they should be 3 to 10 cm apart).
7. Do not move the meter or cable during
the transfer.
8. Click OK when you are ready to continue.
9. Follow the prompts on the software.
44
10. The software program may shut off the
meter automatically when the data
transfer is complete.
Notes:
• If the data did not transfer successfully, try again. If you still have problems, contact
Roche Diagnostics.
• To make the most of the download feature, you must set the time and date correctly.
3/9/07
8:42 AM
Page 44

Publicidad

Tabla de contenido
loading

Tabla de contenido