Filling The Lubrication Unit And Level Monitoring; Venting The Lubrication System - Bosch rexroth LU 2/P Instrucciones De Montaje

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 171
34/42
Commissioning
Make sure that the fi lling
fi lter is in the fi ller neck
and fi ll the oil container
up to the marking
MAX LEVEL.
Bosch Rexroth AG, MIT: LU 2/P-24V-3L, 3 842 557 976/2020-08
9.1.1

Filling the lubrication unit and level monitoring

The lubrication unit LU 2/P-24V-3L is equipped with an optical level monitoring
device. If the fi ll level of the oil container is suffi cient, a green LED is lit. If the
minimum fi ll level (MIN LEVEL) is undercut, this LED goes out and the alarm
01 Low level (minimum fi ll level) is activated.
Fig. 14:
Filling the lubrication unit
9.1.2

Venting the lubrication system

1. Turn on the power to the lubrication unit.
2. Press the manual cycle button (Fig. 14, position O) several times until oil emerges
at all lubrication pins.
3. Check all lubrication lines/fi ttings for tightness.
O
GHD
L
V E
L E
A X
M
L
V E
L E
I N
M
LED
557 976-13

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

3 842 562 921

Tabla de contenido