Hofmann geodyna 7800-2p Manual De Operador página 178

Publicidad

178
i-1
Installation
i. Installation requirements
Space requirements
The drawing show the minimum safety requirements:
Fig. i.1
The drawing has two sets of dimensions:
1
from the wall to the center of the holes: on
the left and top of the drawing
2
from the wall to the outline of the cabinet: on
the right and bottom of the drawing
Floor requirements
The floor should be
- horizontal;
+/- 1°
tolerance
- even; within 2 mm
- able to bear the weight of the balancer as stated in
Chapter 2 of the Operator's Manual.
The floor on which the balancer will be installed
should not relay vibrations from other devices or
from outside the building. External vibrations may
affect the accuracy of the unit.
Note:
The balancer must be positioned directly
on the floo . Do not use spacers to fill gaps.
If the above conditions are satisfied, the balancer
does not need fixing to the flo .
Power supply requirements
Refer to Chapter 2 of the Operator's Manual for mains
power requirements.
WARNING: ENSURE THAT AN APPROVED
WALL MAINS OUTLET IS AVAILABLE.
WARNING: NEVER GUIDE POWER SUPPLY
CABLES OVER THE FLOOR, UNLESS
PROTECTED BY AN APPROVED COVER.