Descargar Imprimir esta página

Sartorius Gold & Carat II Line GL822I-2 Serie Instrucciones De Manejo página 14

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 129
Installation
5
Installation
5.1
Scope of Delivery
Item
Device
Pan support
Weighing pan
Frame draft shield, mounted
Power supply unit with country-specific
AC adapters
Operating Instructions
5.2
Selecting an Installation Site
Procedure
Make sure that the following conditions are met at
t
the installation site:
Condition
Features
Ambient
— Suitability tested (ambient condi-
conditions
tions see Chapter 15.1, page 36)
Setup surface
— Stable, even surface with little
vibration
— Sufficient space for the device (de-
vice space requirements see Chap-
ter "15.9 Device Dimensions",
page 39).
— Sufficient load bearing capacity for
the device (device weight see
Chapter "15.10 Metrological Data",
page 40).
Access to
Convenient and safe
parts relevant
to operation
14
Operating Instructions Gold&Carat II Line
5.3
Unpacking
Procedure
Unpack the device.
t
If the device is stored temporarily: Observe the stor-
t
age information (see Chapter 13.1, page 34).
Quantity
Keep all parts of the original packaging, e.g. to return
t
1
the device.
1
1
5.4
Assembling the Device
1
1
Procedure
1
5.5
Acclimatizing the Device
When a cold device is brought into a warm environment:
The temperature difference can lead to condensation
from humidity in the device (moisture formation). Mois-
ture in the device can lead to malfunctions.
Procedure
Allow the device to acclimatize for approx. 2 hours at
t
the installation site. The device must be disconnect-
ed from the power supply beforehand.
Attach the pan sup-
t
port (2).
Place the weighing
1
t
pan (1) on
top.
2

Publicidad

loading