Descargar Imprimir esta página

Sartorius Gold & Carat II Line GL822I-2 Serie Instrucciones De Manejo página 31

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 129
9.3
Assembling the Weighing Pan
and Associated Components
Procedure
Connect the device to the power supply (see Chap-
t
ter "6.2 Connecting the Power Supply", page 15).
Place the frame draft
t
shield onto the device.
Carefully turn the
t
frame draft shield
clockwise carefully
until the screws are in
the small recess.
Carefully tighten the
t
three screws.
Attach the pan sup-
t
port.
Position the weighing
t
pan.
Cleaning and Maintenance
9.4
Maintenance Schedule
Interval
Component
Regularly;
Device
depending on the
operating conditions
9.5
Software Update
For a software update, contact Sartorius Service.
Operating Instructions Gold&Carat II Line
Action
Contact
Sartorius
Service.
31

Publicidad

loading