Descargar Imprimir esta página

Riello RS 130/M TC Instrucciones De Instalación, Uso Y Mantenimiento página 17

Quemador de gas con aire soplado

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation
4.7
Assembly of the gas train
The gas train can enter the burner from the right or left side, depend-
ing on which is the most convenient, see Fig. 18.
The gas train must be connected to the gas attachment 1)(Fig. 18) with
the flange 2), the gasket 3) and the screws 4) supplied with the burner.
The gas solenoids must be as close as possible to the burner, to
ensure that the gas reaches the combustion head within the safety
time of 3 s.
Ensure that the maximum pressure necessary for the burner is
included in the calibration field of the pressure adjuster (colour of the
spring).
See the accompanying instructions for the adjustment
of the gas train.
WARNING
20032905
15
GB
D722
Fig. 18

Publicidad

loading

Este manual también es adecuado para:

Rs 130/m tl2003258320039116