Descargar Imprimir esta página

Riello RS 130/M TC Instrucciones De Instalación, Uso Y Mantenimiento página 4

Quemador de gas con aire soplado

Publicidad

Idiomas disponibles

Idiomas disponibles

Contents
Section
1
Information and general warnings
1.1
Information about the instruction manual
1.2
Guarantee and responsibility
2
Safety and prevention
2.1
Introduction
2.2
Personnel training
3
Technical description of the burner
3.1
Burner designation
3.2
Models available
3.3
Burner categories - Countries of destination
3.4
Technical data
3.5
Burner weight
3.6
Overall dimensions
3.7
Firing rates
3.8
Burner components
3.9
Burner equipment
3.10 Servomotor
4
Installation
4.1
Notes on safety for the installation
4.2
Handling
4.3
Preliminary checks
4.4
Operating position
4.5
Securing the burner to the boiler
4.6
Combustion head adjustment
4.7
Assembly of the gas train
4.8
Electrical wiring
4.9
Calibration of the thermal relay
5
Start-up, calibration and operation of the
burner
5.1
Notes on safety for the first start-up
5.2
Operations before start-up
5.3
Burner start-up
5.4
Burner ignition
5.5
Burner adjustment
5.6
Operation sequence of the burner
5.7
Burner flame goes out during operation
5.8
Stopping of the burner
5.9
Measuring the ionisation current
5.10 Checking the air and gas pressure on the com-
bustion head
5.11 Final checks (with burner operating)
6
Faults - Probable causes - Solutions
7
Maintenance
7.1
Notes on safety for the maintenance
7.2
Maintenance programme
7.3
Opening the burner
7.4
Closing the burner
A
Appendix - Electrical panel layout
B
Appendix - Accessories (on request)
C
Appendix - Firing rate on basis of air density
20032905
Page
3
3
3
4
4
4
5
5
5
5
6
6
6
7
8
9
9
10
10
10
10
11
11
13
15
16
17
18
18
18
19
19
19
22
22
22
23
23
23
24
25
25
25
26
26
27
32
33
2
GB

Publicidad

loading

Este manual también es adecuado para:

Rs 130/m tl2003258320039116