8. check on the safeguard against the lifting hazard: in automations
with vertical movement it is necessary to verify that there is no
lifting hazard. This test can be carried out in the following way:
- hang a 20 kg load (e.g. a sand bag) midway along the boom's
length
- send an opening command and check that during the
manoeuvre the boom does not exceed a height of 50 cm above
its closed position
- if the boom exceeds this height, the motor force must be
reduced (refer to the chapter "PROGRAMMING")
9. if potentially dangerous situations due to the boom's movement
have been prevented by limiting the impact force, the latter must
be measured according to the EN 12445 standard and, if the
"motor force" control is used to aid the system in reducing the
impact force, it is necessary to test various adjustments to find
the one that gives the best results
10. checking the efficiency of the unlocking system:
- put the boom in the closed position and manually unlock it (see
paragraph "Manually unlocking and locking the gearmotor")
- verify that this occurs smoothly
- verify that the manual force to move the boom during the
opening phase does not exceed 200 N (roughly 20 kg)
- the force is measured perpendicularly to the boom at 1 m from
the rotation axis
11. verification of the power supply disconnection system: operate
the power disconnection device and disconnect any available
back-up batteries; check that all the LEDs on the control unit are
OFF and that the boom remains stationary when a command is
sent. Check the efficiency of the locking system to prevent any
unintentional or unauthorised connection.
14.2 - COMMISSIONING
m
Commissioning can only be performed after all testing
phases have been successfully completed.
m
Before commissioning the automation, ensure that the
owner is properly informed of all residual risks
and hazards.
m
The gate cannot be commissioned partially or under
"temporary" conditions.
To commission the automation:
1. compile the automation's technical file, which must include the
following documents: overall drawing of the automation, wiring
diagram, risk assessment and relative solutions adopted, the
manufacturer's declaration of conformity for all devices used and
the declaration of conformity compiled by the installer
2. affix a permanent label or sign on the cubicle specifying the
operations for unlocking the gate and manoeuvring it manually
"Figure 32"
32
3. affix a data plate to the cubicle specifying at least the following
data: type of automation, name and address of the manufacturer
(responsible for commissioning), serial number, year of
manufacture and CE mark
4. compile the declaration of conformity of the automation and hand
it to the owner of the automation
5. compile the User Manual of the automation and hand it to the
owner of the automation
6. compile and provide the owner with the automation's
"Maintenance schedule", containing the maintenance instructions
for all the automation's devices.