Maintenance Intervals En - Abicor Binzel iROB P400 Instructivo De Servicio

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

9 Maintenance and cleaning
9.1 Maintenance intervals
NOTICE
• The maintenance intervals given are standard values and refer to single-shift operation.
Observe the instructions given in EN 60974-4 Inspection and test during the operation of arc welding
equipment and the laws and guidelines valid in the respective country.
Check the following:
Daily
Check all cables, connecting hoses and
connections for damage, replace them if
necessary
General condition
Install the robot welding power source
maintaining a circumferential clearance of
50 cm to ensure optimum circulation of the
cooling air.
Tab. 10
Maintenance intervals
EN - 20
Monthly
Check all mobile parts and roll bearings for
correct functioning and replace them, if
necessary.
Quarterly
Both fans, replace them if necessary.
iROB

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Irob p400 mvIrob p500

Tabla de contenido