Putting The Htl Into Service - Dhollandia DH-SM.20 Instrucciones De Montaje

Tabla de contenido

Publicidad

EN

8) PUTTING THE HTL INTO SERVICE

E
S
Ensure that all electrical connections are cor-
rectly finished, and that all mounting bolts are
fastened with the required torque.
Switch on the battery switch. Use the functions "lift" and
"tilt" to bring hydraulic pressure in the hydraulic circuits.
Do not overpressure at this stage.
Consult the USER'S MANUAL in case of doubt
with regards to the correct use of the different
lift functions, and of the applicable safety in-
structions [See Fig. 8.1].
M
S
Remove the locking bolts of the swing brackets
M
of the mechanical tilt device [See Fig. 8.2, 1.3].
Execute the lift and tilt functions at least 2 times, so that
the hydraulic cylinders can be purged completely.
Preferably, raise the rear end of the vehicle off the ground,
or raise the vehicle air suspension to its maximum. Start-
ing from the platform in work position at the loading floor:
1. Open the platform completely (below horizontal posi-
tion), until the tilt cylinders are fully retracted, and con-
tinue to push the function "open" for another 20 sec
[See Fig. 8.3].
2. Tilt the platform back up to horizontal position, and
lower the platform completely (further down below
normal ground level), until the lift cylinders are fully
retracted, and continue to push the function "lower" for
another 20 sec [See Fig. 8.4].
DHOLLANDIA
8.1
EJ.
8.3
73
M
8.2
+
EJ.
8.4

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Dh-ssu.30Dh-smr.20Dh-ssur.30

Tabla de contenido