18) Pull the Perlon stockinette over the plaster positive up to the socket
edge. Tie the upper section of the Perlon stockinette and fold the
remaining length over the plaster positive.
19) Soak the longer PVA bag and pull it over the plaster positive.
20) Perform the casting process with Orthocryl.
21) Finish the prosthetic socket (see Page 20).
5.1.5 Finishing the Prosthetic Socket
Required materials:
>
Snap Bushings
1) Mark and trim the contour of the prosthetic socket.
2) Sand the distal end of the socket down to the vacuum forming dummy
and the heads of the cap screws (see Fig. 12).
3) On a level surface, check whether the sanded surface is flat. Rework as
needed.
4) Remove the vacuum forming dummy and the cap screws from the pros
thetic socket.
5) Remove the prosthetic socket from the plaster positive.
6) Sand the contour of the prosthetic socket.
7) Insert the snap bushings into the openings from which the cap screws
were removed (see Fig. 13).
5.2 Installing the Shuttle Lock and Socket Adapter
► Install the shuttle lock and the socket adapter according to the 647G931
Instructions for Use.
6 Maintenance
► The prosthetic components should be inspected after the first 30 days of
use.
► Inspect the entire prosthesis for wear during normal consultations.
► Conduct annual safety inspections.
7 Legal Information
All legal conditions are subject to the respective national laws of the country
of use and may vary accordingly.
7.1 Liability
The manufacturer will only assume liability if the product is used in accord
ance with the descriptions and instructions provided in this document. The
manufacturer will not assume liability for damage caused by disregard of this
20 | Ottobock