Aros 10000P Manual De Instrucciones página 91

Inversor fotovoltaico paraconexión en red
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

Data Logger/Display Function Tree:
Welcome
3s wait
- ENGLISH -
↑&↓
←&→
Measures window
↑&↓
←&→
Daily graph
↑&↓
←&→
Weekly graph
↑&↓
←&→
ERROR
HISTORY
↑&↓
←&→
SYSTEM
INFORMATION
↑&↓
←&→
Communication
setting
↑&↓
1. Press → to edit the measures
2. Press ↑&↓ to choose the channel
3. Press
to change
4. Select the measure with ↑&↓
5. Press
to confirm
The display shows a window starting from the first
data of the day.
The time span is 12h.
Select the date to display by using ←&→ keys.
Push
to scroll window by means of ←&→ if
time span is too short.
The display shows data from the first available
data of a week: Sunday, for example.
The time span is 7 days
Use ←&→ keys to select the week to view.
This window shows the last two errors.
It is possible to scroll through the error history by
pressing
and scrolling by means of ↑&↓ keys
1. Date
1. Use ↑&↓keys to select item
2. TIME
2. Use
3. AUDIO ALARM
3. Use ↑&↓to change
4. Language
4. Use ← & → to move the cursor
5. Press
1. Use
Communication
2. Use
speed change
and 9600 bps
3. Use
key to set
again to confirm
key to set
↑ &↓ to change between 1200
key to confirm
Page 91

Publicidad

Tabla de contenido

Solución de problemas

loading

Este manual también es adecuado para:

Pvi 10kw

Tabla de contenido