Operation; Initial Start-Up - Eaton Pulsar Serie Manual De Instalación Y De Usuario

Ocultar thumbs Ver también para Pulsar Serie:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

3.1

Initial Start-Up

To ensure that your system is configured in complete accordance with safety regulations and to benefit from the
manufacturer's warranty, please contact Technical Support.
LOAD UNPROTECTED
00.0 KVA/00% LOADED
ON AUTO BYPASS
PRESS ( I ) to START
33
UPS Set-Up
LOAD PROTECTED
00.0kVA/000% LOADED
ONLINE MODE
1 UPS +3 UPS redundant
A
B
30
(A) Number of modules required to support the load
(B) Number of modules available for redundancy
Examples:
If the display indicates 1+3 (redundancy) then
the load is 5kVA or less and three modules are
available for redundancy.
If the display indicates 3+1, then the load is 15kVA
or less and one module is available for redundancy.
22
34
20
21
32
34
29
1. Bypass switch is in normal position and locked.
2. Set the upstream circuit breaker (not included) to the ON
position.
3. Turn input switch on the rear panel of the MX Frame to
the ON position (as shown below).
Input
Switch
Bypass
Switch
4
BATTERY
DETECTION
The equipment is powered via the Normal AC source, but not
protected by the UPS.
CAUTION:
DO NOT DISCONNECT
BATTERY CABLE
UNDER LOAD
BATTERY CONNECTOR
An 8 hour recharge period is recommended to get full
3
BATTERY
DETECTION
battery backup time
LED (22) is ON, LEDs (33) and (34) are green.
CAUTION:
DO NOT DISCONNECT
BATTERY CABLE
UNDER LOAD
BATTERY CONNECTOR
2
BATTERY
22
DETECTION
4. Press and hold the "I" (ON) button (29) for 3
seconds. The buzzer beeps once.
MX Frame performs an internal test sequence. Display
will show "self diagnosis in progress...". LEDs (20), (30),
CAUTION:
DO NOT DISCONNECT
BATTERY CABLE
UNDER LOAD
BATTERY CONNECTOR
(32), (34) are on.
1
BATTERY
DETECTION
The MX Frame is now in normal operating mode
(ONLINE MODE) and the equipment is protected.
If LED (21) or (22) is ON, an alarm has occurred (for
troubleshooting, see Section 5.1).
CAUTION:
DO NOT DISCONNECT
BATTERY CABLE
UNDER LOAD
BATTERY CONNECTOR
The screen at start-up shows overall status of the MX
Frame. Scroll down to access either menu below:
◗ UPS Set-Up – for personalization (see Section 4.4)
◗ Maintenance – to monitor status of individual
modules (see Section 4.5)
Individual modules may be selected within the
"Maintenance" menu by navigating with the buttons
below:
ESC
t
s
See Section 4.1 for display hierarchy.
Slot 1
Slot 2
Input
Switch
RS-232
CONTACTS
RPO
200-250V~,24A
180VDdc
200-250V~,24A
200-250V~,24A
180VDdc
200-250V~,24A
Normal AC Source
Bypass Source
Output
L2(N)
L1
L1
L2(N)
L1
180VDdc
180VDdc
Warning:
High leakage current.
Earth connection
essential before connecting supply.
back one screen
scroll down
scroll up
select/enter

3. Operation

L2(N)
L1
XXXXXXXX
XXXXXXXX
XXXXXXXX
XXXXXXXX
86-87021-00 A01 - Page 25

Publicidad

Capítulos

Tabla de contenido
loading