3 - Undo the screws (C) to remove the lid (D).
4 - Connect the circuit-breaker (A) to the terminal
board (E) of the appliance as shown in the dia-
gram and in the electrical system diagram at
the back of the manual.
Use a cable with at least H05RN-F character-
istics.
CONVERSION OF GAS SUPPLY
The manufacturer has tested the appliance with its
own mains gas, identified by the sticker applied to
the nameplate.
If the type of gas to be connected is different from
that used for testing, proceed as follows.
1 - Turn off the gas supply tap (A).
2 - Change the burner nozzle (see page 26)
3 - Change the burner air bushing (see pag. 26)
4 - Change the pilot light nozzle (see page 27)
5 - Adjust the gas solenoid valves (see page 24)
6 - Remove the sticker from the nameplate and ap-
ply the new one to identify the gas being used.
Important
On completion of the operation, make sure
that there are no gas leaks or malfunctions.
TESTING OF THE APPLIANCE
Important
Before it is put into service, the system
must be tested to check the operating con-
ditions of every single component and
identify any malfunctions. In this stage, it is
important to check that all health and safety
requirements have been complied with in
full.
Important
When connecting, take care over the con-
nection of the neutral and earth wires; if
they are not connected correctly, the burn-
er does not light.
5 - Fit the lid (D) and secure it with the screws.
6 - Close the door (B) when the operation is com-
plete.
A
To test the system, make the following checks.
1 - Turn on the gas supply tap and check that the
connections are right.
2 - Check that the mains gas is the same as that
used for commissioning of the appliance, and
carry out the conversion procedure if necessary
(see page 23)
- 23 -
IDM-3960200240.tif
IT
GB
DE
FR
IDM-3960200250.tif
ES
English