Maintenance And Repair - Vogel IG502-E Instrucciones Para El Manejo

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 123
11. Maintenance and repair 12. Technical data
Carry out the following maintenance and inspection
works at regular intervals:
• Check the level in the lubricant reservoir.
• Check all components of the system for leakage
at regular intervals.
• Perform a visual check of the lubricating condition
of bearings.
• You can check the basic function of the control
unit and system components by activating an
intermediate lubrication cycle.
• In addition, check electrical connections in the
case of fault messages.
• Replace defective fuses exclusively by equivalent
new ones.
Any other works the scope of which
exceeds the above scope may be
performed only by approved Vogel
service personnel.
Order No.
Rated voltage U
N
Type of protection
Max. load output M
SL output
Data preservation
Working temperature
Storage temperature
EC directives
Fusing max.
Dimensions L x W x H
Programmable pause times
Programmable pump running times
Programmable impulses
Operation hour memory
Fault hour memory
Page 32
Operating Instruction Universal Control Unit IG502-E
IG502-E+912 (12 V DC) or IG502-E+924 (24 V DC)
DC: 12 V or 24V
IP 20, DIN 40050 / connector IP 00
5 A at 24 V 5 A at 12 V
4 W
unlimited
-25 °C to +75 °C
-40 °C to +75 °C
89 / 336 / EC and 95 / 54 / EC
5A
138 x 65 x 40
0.1h to 99.9 h
0.1 min to 99.9 min
1 to 999
0 to 99999.9 h
0 to 99999.9 h
Contents
Chapter
Central
11/12
Lubrication

Publicidad

Tabla de contenido
loading

Tabla de contenido