Generac 20 kW Synergy Guia De Instalacion página 47

Ocultar thumbs Ver también para 20 kW Synergy:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Turn OFF (or OPEN) the main Utility disconnect.
1.
Move the Generator Disconnect Circuit Breaker switch to the OFF (Open) position.
2.
Press OFF on the control pad.
3.
Allow the unit to run for one minute to cool down.
4.
If the generator is to remain off for more than one hour and utility is not present, remove the 7.5 Amp fuse adja-
5.
cent to the control pad to avoid draining the battery.
To turn the generator back ON:
NOTE: If removed, install 7.5 amp fuse and T1 fuse, and then follow instructions under Install Wizard.
Press AUTO on the control pad.
1.
Once the generator is running, IMMEDIATELY move the GENERATOR DISCONNECT Circuit Breaker switch to
2.
the ON (Closed) position. This prevents the speed from ramping down before the load is applied, a condition
which could cause the engine to stall. Loads are now powered by the standby generator.
The system is now operating in the AUTO mode. The main utility disconnect can be turned ON (or Closed), but to shut
the unit off, this complete process must be repeated.
Installation Guidelines for Air-Cooled Generators
Operation
41

Publicidad

Tabla de contenido
loading

Tabla de contenido