Control Pad - Generac 20 kW Synergy Guia De Instalacion

Ocultar thumbs Ver también para 20 kW Synergy:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Operation
Section 7
7.1 — Control Pad
*
The control pad is intended for use by qualified service personnel only.
See Figure 7-1. The control pad is located under the lid of the enclosure. The lid is secured by two locks, one on each
side of the enclosure. For best results, press down on the lid directly above the side lock, and while holding the lid
down, use key to unlock the latch. Repeat step on opposite side of enclosure. Always unlock both the left and right side
locks before attempting to lift the lid.
NOTE: The lid may appear stuck if pressure is not applied as described. Always verify that the side locks are
unlocked before pulling up on lid.
To remove the front access panel, lift it straight up to disengage side hooks, and then outward away from unit.
When closing the unit, remember to lock both left and right side locks.
LCD Screen

Control Pad

Installation Guidelines for Air-Cooled Generators
7.5 Amp Fuse
and USB Port
Figure 7-1. Control Pad and Side Compartment
(Under Flap)
Side Lock
Generator Disconnect
Circuit Breaker
Side Door Compartment
31

Publicidad

Tabla de contenido
loading

Tabla de contenido