Connection of critical loads
9.3. Critical load connection process
Follow the instructions below to connect the critical loads:
1.
Pass the critical load wiring through the dedicated cable grommet (see section
inlets").
2.
Connect the push-in type terminals marked as J82 Critical Loads, respecting the polarities. The operation
of this type of terminal is described in
3.
Check that the push-in spring connection is tight.
ABH2014IQM01_A - Installation and Operation Manual
N
L
"7. Connection/disconnection of wiring in push-in type
Ingeteam
L
Line
N
Neutral
"2.5. Description of cable
terminals".
EN
ES
FR
PT
29