Connection of critical loads

9.3. Critical load connection process

Follow the instructions below to connect the critical loads:
1.
Pass the critical load wiring through the dedicated cable grommet (see section
inlets").
2.
Connect the push-in type terminals marked as J82 Critical Loads, respecting the polarities. The operation
of this type of terminal is described in
3.
Check that the push-in spring connection is tight.