Storage System Connection Process - Ingeteam INGECON SUN STORAGE 1Play Manual De Instalacion Y Uso

Ocultar thumbs Ver también para INGECON SUN STORAGE 1Play:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Connection of the storage system

8.4. Storage system connection process

To connect the storage system:
1.
Loosen the cable glands indicated with BATTERY+ and BATTERY- and insert the storage system wiring,
respecting the polarities.
2.
Use two of the ferrite cores supplied with the unit and make two turns with the positive and negative
wires of the storage system.
3.
Connect the wiring to the push-in type terminals marked as J50 BATTERY + and J51 BATTERY
-, respecting the polarities. The operation of this type of terminal is described in "7. Connection/
disconnection of wiring in push-in type terminals".
4.
Correctly tighten the packing glands to prevent losses to the protection class, verifying that the wiring is
not taut.
ABH2013IQM01_C - Installation and Operation Manual
Ingeteam
EN
ES
FR
PT
29

Publicidad

Tabla de contenido

Solución de problemas

loading

Tabla de contenido