Completing Installation of the GRAFIK Eye
1. Mount the control unit in the wallbox as
shown using the four screws pro vid ed.
Note: Follow all local and national
electrical codes when installing IEC
PELV wiring with line voltage/mains
wiring.
2. Verify installation:
• Restore power.
• Press the top scene button. The LED will
light.
• Press the zone raise and lower buttons.
Make sure the control unit is dimming all
connected loads.
3. Apply the protective overlay to the control
unit.
®
QS with DALI Control Unit
®
Protective overlay
(apply after installation)
For additional information, see the complete installation and operation guide at www.lutron.com/qs
GRAFIK Eye
QS with DALI Control Unit Quick Installation and Operation Guide 9
®
200 mm
87 mm
95 mm
Note: When tightening mounting
screws, make sure that the
hinged cover and faceplate
will open fully, as shown.
Wall