Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

Rack Setup for the EBM

NOTE Mounting rails are required for each individual cabinet.
NOTE The recommended configuration is to install the EBM(s) in the lower part of the rack,
with the UPS directly above the EBM(s).
To install the optional EBM rail kit:
1.
Select the proper holes in the rack for positioning the EBM in the
rack (see Figure 1).
NOTE The EBM takes up position 1 through position 9.
Bottom of Rack or
Top of Other Cabinet
2.
If access to the sides of your rack is difficult, adjust the length of
the rails (see Figure 3) and loosely install the fasteners (see
Figure 5) before continuing to Step 3.
®
Eaton
9140 (9910-E82/E83) UPS Installation Guide for IBM
Figure 1. Front Rail Screw Positions for the EBM
®
Applications
INSTALLATION
Position 8
Screw Positions
for Rail and Front
Position 5
Mounting Bracket
Position 4
Position 3
Position 2
S
164201715 Rev 2
www.eaton.com/ibm
7

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

91409910-e829910-e83

Tabla de contenido