Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

Rack Setup for the UPS

The UPS is heavy (42 kg/92 lb). A minimum of two people are required to remove the UPS
from its carton.
NOTE Mounting rails are required for each individual cabinet.
NOTE The recommended configuration is to install the optional EBM(s) in the lower part of
the rack, with the UPS directly above the EBM(s).
To install the UPS rail kit:
1.
Select the proper holes in the rack for positioning the UPS in the
rack (see Figure 13).
NOTE The UPS takes up position 1 through position 18.
Bottom of Rack or
Top of Other Cabinet
®
Eaton
9140 (9910-E82/E83) UPS Installation Guide for IBM
C A U T I O N
Figure 13. Front Rail Screw Positions for the UPS
®
Applications
INSTALLATION
Position 17
Screw Positions for
Upper Front
Mounting Bracket
Position 11
Position 8
Screw Positions for
Position 5
Rail and Lower Front
Mounting Bracket
Position 4
Position 3
Position 2
S
164201715 Rev 2
www.eaton.com/ibm
17

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

91409910-e829910-e83

Tabla de contenido