Batteries Disposal; Batteries Charge Level Indicator; Hour Meter; Squeegee Assembly - Tornado 99732 Manual De Operaciones Y Mantenimiento

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

ATTENTION:
Never charge a GEL battery
with a non suitable recharger.
Strictly follow the instructions
supplied by the batteries and
recharger manufacturer.
In order not to cause perma-
nent damages to the batteries,
it is necessary to avoid their
complete discharge, providing
for the recharging within a few
minutes after the batteries dis-
charge signal starts blinking.
NOTE: Never leave batteries
completely discharged even if
the machine is not used. In case
of traditional batteries, please
check the electrolyte level every
20 recharging cycles and even-
tually top them up with distilled
water.
ATTENTION:
For the recharge of the batteries
it is necessary to follow strictly
all the indications given by the
manufacturer/distributor. All the
installation and maintenance
operations must be carried out
by qualified staff. Danger of
gas exhalations and emis-
sion of corrosive liquids. Fire
danger: do not approach with
free flames.

BATTERIES DISPOSAL

It is compulsory to hand over
exhausted batteries, classified
as dangerous waste, to an au-
thorized institution according to
the current laws.
BATTERIES CHARGE LEVEL
INDICATOR
TURNING THE KEY (9)
CLOCKWISE, ON THE DIS-
PLAY (1) APPEAR IN SE-
QUENCE THE FOLLOWING
INFORMATION:
1. The version (for example
A003) of software installed on
the machine.
2. The setting of the battery
check card is for the 24V ver-
sion:
GE 24: check card set for GEL
batteries
Pb 24: check card set for lead
batteries
3. The batteries charge level
indicator (1) is digital. The bat-
tery charge level starts at 90,
which indicates the 90% of the
total charge and decreases by
10 to 10. When the charge level
reaches 20%, the display starts
blinking, so you are about at the
end of working time.
ATTENTION:
After a few seconds from the
blinking of the four lines, the
brushes motor stops automati-
cally. With the remaining charge
it is anyhow possible to finish
the drying operation before pro-
ceeding to the recharge area.
12

HOUR METER

The machine is equipped with
an hour meter located on the
same display of the battery
charge level indicator (1). Keep-
ing the button (8) pressed for
more than 3 seconds, the first
data indicates the working hours
and after a few seconds the
working minutes are shown.

SQUEEGEE ASSEMBLY

1. Maintain the squeegee sup-
port (1) slightly lifted from the
floor.
2. Insert the two stud bolts (3)
placed on the upper part of the
squeegee (2) inside the slots on
the support.
3. Block the squeegee by rotat-
ing the lever (4) clockwise.
4. Insert the squeegee hose
(5) into its coupling, respecting
its position as indicated in the
figure.

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

99732 bd 3299732 bd 26

Tabla de contenido