Gas Installation - Jøtul GF 100 BF2 Instrucciones Para Instalación

Ocultar thumbs Ver también para GF 100 BF2:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

ENglish
Unpack the boxes with the logs.
Follow the mounting instructions included in the log set.
After mounting is complete insert the glass frame in position
and fasten the two latches at the top of the burn chamber.
Required gas pressure
Gas type
Right testpoint (A)
Inlet pressure
Nat. Gas G20
20 mbar
Nat. Gas G25
25 mbar
LPG G30/G31
37 mbar
20

7.0 Gas installation

Gas installation must only be performed by qualified personnel.
It is important to adhere to national and local regulations that
apply.
The gas container must be stored/installed according to
regulations .
The gas container must have a pressure regulator that reduces
the pressure to the required level. (See technical data for gas type
and pressure before connecting to the gas valve. The gas valve
must not be exposed to pressure above 55 mbar (5,5 kPa) during
pressure testing.
Gas tubes must be made of steel (DIN 2448/1629, DIN 2458/1626,
DIN 2440, DIN 2441) or copper (DIN 2110).
For practical reasons, the vent system should be installed before
the stove is connected to the gas supply.
The gas valve has a transition nipple, a locking ring nut and
a locking ring (compressing fitting) for an 8mm copper pipe.
(Included in the conversion set)
All tube connections must be approved for natural gas and
LPG.
The gas pipe must have an approved shutoff valve.
Only use approved sealing agent (tape) at all the pipe
connections.
When the pipe sections have been assembled and connected
to the stove, open the gas supply and light the stove (see
lighting instructions). Perform a soundness test on all the
pipe connections.
7.1 Testing gas pressure (fig. 7)
Correct gas pressure is important for the safe use of gas in the
stove.
It is important that the correct gas pressure is set during the
installation of the stove.
The gas valve is equipped with outlets for the testing of gas
pressure. These are located underneath at the right side of the
product.
Right testpoint (A): For gas pressure to the valve (volume of gas
to the valve) See technical data.
Left testpoint (B): For gas pressure from the valve (volume of gas
coming out of the valve to the burner, i.e. working pressure).
Loosen the screw on the outlet and attach the tube from the
manometer to the outlet.
Left testpoint (B) Hot
Set by adjustment
High
Low
12,5 mbar
3,6mbar
10,0 mbar
3,6 mbar
19,0 mbar
8,9mbar
Left Testpoint (B) Cold
Set by adjustment
High
Low
12,0 mbar
3,1 mbar
9,5 mbar
3,1 mbar
18,5 mbar
8,4 mbar

Publicidad

Tabla de contenido
loading

Tabla de contenido