RK Rose+Krieger Multilift I Manual De Montaje página 109

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

Maintenance plan
Interval
Before commissio-
ning/regularly
Weekly
Monthly
Once a year
After 100,000 opera-
ting hours
20.02.2019
Maintenance work
Multilift II ESD lifting column/Multilift II telescope ESD:
Check the effectiveness of the electrical connection in the
lifting column before commissioning and afterwards during
operation, regularly within the scope of ESD monitoring.
Check the lifting column for soiling. If necessary, clean the
lifting column with a clean cloth.
Note: Do not use cleaning agents containing solvents!
Inspect the motor's electrical connections for mechanical
stress and a secure fit.
Check the lifting column for damage (visual inspection).
Carry out a safety inspection of the lifting column as per
EN 62353.
Check that the limit switches/end positions are working:
n
For Mono versions:
Move the lifting column into the final positions in both
directions.
n
For Synchro versions:
Carry out a reference run.
Multilift II impact lifting column:
Replace the lifting column after 100,000 impact loads with
maximum impulse.
Lifting column Multilift I/Multilift II
Maintenance and troubleshooting
Maintenance plan
Personnel
Qualified electrician
Assembly staff
Qualified electrician
Assembly staff
Qualified electrician
Assembly staff
Assembly staff
109

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Multilift ii

Tabla de contenido