Install The Hood - Broan BEST PK22 Manual Del Usuario

Ocultar thumbs Ver también para BEST PK22:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

INSTALL THE HOOD

1. Cut a hole in the bottom of the cabinet in
order to settle the hood.
2. Insert (2) mounting screws (M4x30mm
Pan Head) through side of hood behind
filters with bushing so they do not
protrude externally.
3. Insert the hood and attach it temporarily
using the (2) mounting screws
(M4x30mm Pan Head).
4. After unit is inserted and is flush with
bottom of opening, secure the hood
with (4) mounting screws (4,2x15mm
Pan Head).
MOUNTING
SCREWS
(M4x30mm)
4 MOUNTING
SCREWS
(4,2x15mm)
METAL OR OTHER
NON-COMBUSTIBLE
MATERIAL
(2)
SEE
CUTOUT
DIMENSIONS
- 6 -
CUT A HOLE IN THE BOTTOM OF
THE CABINET
14-15/16"
A
A = 26-1/8" (PK2229)
34-3/4" (PK2238)
FRAME
2 MOUNTING SCREWS
(M4x30)
4 MOUNTING SCREWS
(4.2x15mm)
1-5/8"
8-3/4"
4-9/16"
1-9/16"
TOTAL
OF 2
BUSHING

Publicidad

Tabla de contenido
loading

Tabla de contenido