Item No.
6.3.2
Function of the mechanical interlock with the compartment has been
checked (conditions according to operating instructions).
6.4
Subsequently coding of withdrawable units has been implemented
correctly, according to the supplied coding scheme.
6.5
After wiring changes (see 3.4 above), the wire routing has been checked
for
– location inside the withdrawable unit outlines
– sufficient protection against contact with sharp edges
– movable wires (at least in both possible end positions) having sufficient
space for the loop and the necessary length.
6.6
With degree of protection IP42 and IP54, the sealing of the instrument
panel has been checked and, if damaged, replaced.
The sealing frames attached to the door for ACB control panels have been
checked and were in good condition.
7. Electrical function test
Item No.
7.1
Grounding system continuity test
7.2
Insulation test has been performed with R> 1000/V of the rated
operational voltage. Faults have been located and eliminated.
7.3
Control voltage present
7.4
Alarm starting checked
7.5
Release functions checked
7.6
Measuring instruments and indicators checked
7.7
Ground-fault detection checked
7.8
Electrical interlocks of functional units checked
– of device combinations
– of circuit breakers
– transfer trip connection from medium voltage
– others
7.9
Tested after connection to supply
Phase sequence check
7.10
Arc fault detection system (if applicable)
Amount of sensors per channel at main and extension units checked
according to circuit diagram (see manufacturer manual)
Sensors exclusively sensitive to light:
Trip of incoming circuit breakers (LV), arc quenching device (if existing)
and feeder circuit breakers of upstream grid (LV or MV, if applicable)
checked
Sensors sensitive to light and overcurrent:
Trip of incoming circuit breakers (LV), arc quenching device (if existing)
and feeder circuit breakers of upstream grid (LV or MV, if applicable)
checked
Setup of main and extension units according to documentation checked
Commissioning company:
Commissioning department: ..................................................
Date:
A4
Commissioning Step Performed
Commissioning Step Performed
Wire
L1 – L2
L1 – L3
L2 – L3
L1 – PEN
L1 – PEN
L1 – PEN
PE – PEN
right
left
...................................................
..................................................
Yes
No
Remarks
Yes
No
Remarks
Gemessen [M]
Name:
....................................
Signature: ....................................
8PQ9800-7AA73