Siemens SIVACON S8 Manual Del Usuario página 33

Ocultar thumbs Ver también para SIVACON S8:
Tabla de contenido

Publicidad

Item
Work to be performed
Notes / Criteria
No.
2.3
Isolation
2.4
Cable and wires
2.5
Equipment
2.6
Electrical connections and
screw connections
3
Maintenance
Switch off and lock out all power supplying the concerned part of the low-voltage switchboard before starting the maintenance.
3.1
Extended visual
inspection
3.2
Cleaning
3.3
Electrical connections and
screw connections
See Section 2.4.2 "Electrical connections and screw connections" and
operating instructions 8PQ9800-7AA72 Electrical connections
3.4
Checking and
See Section 1 Commissioning
return to service
3.5
Verificar ventiladores
The specifications for the several SIVACON cubicles are leading and to be considered accordingly, additionally to general care notes.
B2
short circuit or overload release)
Signs of electrical flashovers or creepage tracks
Cable routing, wiring
Compliance with the bend radiuses
Function of the strain relief
Condition of insulation and labeling
Damage on installed equipment
Signs of flashovers
Signs of overheating
Locking varnish on screw connections is present and intact
Local discoloration due to overheating
Condition of the insulation in the area of the connections
Remove barriers and perform the visual inspection according to 2
Visual inspection of parts of the switchboard that are difficult to access
Mount all removed barriers correctly after inspection.
The switchboard must be cleaned of dust inside and outside with a vacuum cleaner and
brush.
Remove foreign bodies
Cleaning of the ventilation slots, fans, ventilation grilles and replace the filter, if necessary
Tighten non-maintenance-free screw connections with inspection torque
Limpiar los ventiladores existentes y su prueba funcional (see Sección 4.2.4)
Recomendamos remplazar preventivamente los ventiladores después de 5 años.
Yes
No
Remarks / Result
8PQ9800-7AA73

Hide quick links:

Publicidad

Tabla de contenido
loading

Tabla de contenido