Power-Up Sequence - Mettler Toledo IND310drive Manual De Instalación

Ocultar thumbs Ver también para IND310drive:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

Power-up Sequence

The power-up sequence takes approximately 35 seconds (90 seconds for units
For application-
with the original main PCB). The unit will beep when plugged in and will then
specific functions,
display the METTLER TOLEDO logo. The display will be followed by another beep,
refer to the
a truck display, and a status message at the bottom of the screen that shows the
IND310drive
progress of the initialization process. The software version number displays during
User's Guide.
the initialization process.
IND310drive Installation Manual
Figure 2-18: External Sealing
2-19

Publicidad

Tabla de contenido
loading

Tabla de contenido