Taking The Product Out Of Operation; General Procedure; Short-Term Shutdown; Long-Term Shutdown - Grundfos LFE Instrucciones De Instalación Y Funcionamiento

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

9. Taking the product out of operation

The following shutdown procedures will apply for the L pumps in
most normal shutdown situations. If the pump will be inoperative
for a long time, follow the storage procedures in section
term
shutdown.

9.1 General procedure

Always close the outlet gate valve before stopping the pump.
Close the valve slowly to prevent hydraulic shock.
Disconnect and lock off the power to the motor.

9.2 Short-term shutdown

For overnight or temporary shutdown periods under non-
freezing conditions, the pump may remain filled with liquid.
Make sure the pump is fully primed before restarting.
For short or frequent shutdown periods under freezing
conditions, keep the liquid moving within the pump housing
and insulate or heat the pump exterior to prevent freezing.

9.3 Long-term shutdown

For long shutdown periods, or to isolate the pump for
maintenance, close the inlet gate valve. If no inlet valve is
used and the pump has positive inlet pressure, drain all liquid
from the inlet line to stop the liquid flow into the pump inlet.
Remove the plugs in the pump drain and vent holes, as
required, and drain all liquid from the pump housing.
If there will be freezing conditions during long shutdown
periods, completely drain the pump and blow out all liquid
passages and pockets with compressed air. Freezing of the
pumped liquid can also be prevented by filling the pump with
antifreeze solution.
All manuals and user guides at all-guides.com
9.3 Long-
17

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Lcse

Tabla de contenido