Opening The Burner - Riello RS5F Instrucciones De Instalación, Uso Y Mantenimiento

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Gas filter
Change the gas filter when it is dirty.
Combustion
If the combustion values measured before starting maintenance
do not comply with applicable legislation or do not indicate
efficient combustion, consult the Tab. S on page 33 or contact
our Technical Support Service to implement the necessary
adjustments.
7.3

Opening the burner

Disconnect the electrical supply from the burner
by means of the main system switch.
DANGER
Close the fuel shut-off valve.
DANGER
Wait for the components in contact with heat
sources to cool down completely.
If maintenance of the combustion head is required, refer to the
instructions given in "Operating position" on page 14.
For accessing to the interior of the burner, loosen the screws that
secure the cover and proceed with the maintenance operation.
Operating safety hazards
Repairs to the following components may only be
carried out by the respective manufacturers or by
DANGER
personnel instructed by them:
fan motor
air damper
electromagnetic valves
burner programmer
Check the operation
Burner start-up with sequence of the functions
Ignition device
Air pressure switch
Flame monitoring
Seal test of components to the passage of fuel
After carrying out maintenance, cleaning or
checking operations, reassemble the cover and
all the safety and protection devices of the burner.
Maintenance
Leave the burner working without interruption for about 10 min,
checking the right settings in the 1st and 2nd stage of all the
components stated in this manual:
Percentage of CO
CO content (ppm)
NOx content (ppm)
Ionisation current (µA)
Smoke temperature at the flue
35
GB
(%);
2
20141167

Publicidad

Capítulos

Tabla de contenido
loading

Este manual también es adecuado para:

37619713761981920t1

Tabla de contenido