2. MOUNTING THE FRONT LEGS TO THE MAIN BARREL
Parts Required:
1
x
Main Barrel /Hopper Assembly (#11)
1
x
Left Support Leg / Front (#20)
1
x
Right Support Leg / Front (#22)
6
x
Screw (#A)
Installation:
•
Mount the Front-Right Support Leg to the floor end of the Main Barrel
using three screws through the three pre-drilled holes. Install screws
from the inside of the Main Barrel. Next, mount the Front-Left Support
Leg to the hopper end of the Main Barrel using three screws through the
three pre-drilled holes. Install screws from the inside of the Main Barrel.
IMPORTANT: Do not tighten screws completely until bottom shelf is
installed in future step.
3. INSTALLING THE CART FRONT PANEL
Parts Required:
1
x
Cart Front Panel (#17)
2
x
Screw (#A)
5
x
Screw (#C)
Installation:
•
Install the Cart Front Panel to the two Front Support Legs using five
screws (C) as follows: two screws in each Support Leg and one screw into
the Ash Clean-out Tray. Note illustration 3A.
•
Affix the Cart Front Panel to the Main Barrel, from the inside, using two
screws (A). Note illustration 3B.
8
2
11
20
22
3A
17
3B
17