Final Installation Checklist - Midea MGS30S2AST Instrucciones De Instalación

Ocultar thumbs Ver también para MGS30S2AST:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Final Installation Checklist:

The installation process is complete. As a final check to confirm all steps
have been completed successfully, the installer must read through the
following checklist and initial each item indicating the work was performed
according to these instructions:
- Installation space has been confirmed to meet the Clearances and
Dimensions requirements, including that airflow is unobstructed at the
front of the unit.
- Anti-tip bracket has been properly installed, and the range leveling leg
has been confirmed to engage correctly with anti-tip bracket.
- Gas line has been properly connected to the range, and all connections
have been checked for leaks, in accordance with all applicable codes
and regulations.
- Electrical supply has been properly connected to the range, in
accordance with all applicable codes and regulations.
- Conversion for LP gas and high-altitude installations has been completed,
if necessary.
- Gas surface burners have been properly assembled and correct operation
has been verified.
- Oven operation and oven controls have been verified to work correctly.
- The oven door and drawer have been installed properly and operate
correctly. Oven door closes completely.
- All instructions, including this manual, conversion instructions, and anti-tip
bracket instructions, have been left with the owner/resident, with
directions to retain for future reference.
- Pilot lights for any other gas appliances (water heater, furnace, etc.) at
the residence have been re-ignited.
36

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Mgs30s4ast

Tabla de contenido