Descargar Imprimir esta página

Sime MURELLE HE 35 R ErP Manual De Instrucciones página 104

Ocultar thumbs Ver también para MURELLE HE 35 R ErP:

Publicidad

Idiomas disponibles

Idiomas disponibles

reach excessive values when using unpro-
tected  low  temperature  plants.  Before 
activating  the  chimney  sweep  function 
make  sure  that  the  radiator  valves  or 
eventual zone valves are open).
The. test. can. also. be. carried. out. with. the.
boiler.working.in.D.H.W..mode..
For.this,.after.activating.the.chimney.sweep.
function,.open.one.or.more.hot.water.fau-
cets.. Under. these. conditions,. the. boiler.
5
5
will. function. at. maximum. power. with. the.
D.H.W.. circuit. kept. at. between. 60°C. and.
50°C..During.the.test,.the.hot.water.faucets.
must.remain.open.
3
If. the.
key.
. and.
.
are. pressed. during.
the.15.minutes.of.the.chimney.sweep.fun-
1
1
ction,. the. boiler. will. be. brought. respecti-
vely.to.maximum.and.minimum.power.
5
The chimney sweep function will automa-
2
2
tically switch off after 15 minutes or when 
3
is pressed again.
the key .
.
4
1
4.5.2 
Cleaning the filter "Aqua Guard 
Filter System" (fig. 22)
2
To.clean.the.filter,.close.the.delivery/return.
on/off.taps,.turn.off.the.power.to.the.con-
4
trol. panel,. remove. the. casing. and. empty.
the.boiler.using.the.drain.provided..
Place.a.container.for.collection.underneath.
the.filter,.unscrew.the.cap.and.proceed.to.
clean. the. filter,. removing. impurities. and.
limestone.deposits..
Check.the.seal.o-ring.before.reassembling.
the.cap.with.the.filter.
104
3
4
2
Fig..21
Fig..22

Publicidad

loading