2
INSTALLATION
The.boiler.must.be.installed.in.a.fixed.loca-
tion. and. only. by. specialized. and. qualified.
firms. in. compliance. with. all. instructions.
contained. in. this. manual.. Furthermore,.
the.installation.must.be.in.accordance.with.
current.standards.and.regulations..
WARNING: Before installing the boiler,
the installer MUST make sure that the
wall can support the weight.
2.1
INSTALLATION
2.1.1 Single boiler (fig. 4)
–..Boilers. can. be. installed. in. all. domestic.
environments. without. any. whatsoever.
limit.in.terms.of.location.and.comburent.
air.supply.
–..These. boilers. can. also. be. installed. in.
partially.covered.areas,.as.per.EN.15502,.
with. a. maximum. ambient. temperature.
of.60°C.and.a.minimum.ambient.tempe-
rature. of. -5°C.. It. is. generally. advisable.
Single installation
with kit optional code 8101557
WARNING:
- I t is mandatory to arrange the thermal
system with the hydraulic separator.
- W hen replacing one or more boilers in
existing plants, it is advisable to install
a heat exchanger to separate the boiler
circuit from the secondary circuits. See
the pressure curve for the boiler supply
shown in figure 14.
ON
1 2 3
80
to. install. the. boilers. below. weathered.
roofs,. on. the. balcony. or. in. a. protected.
niche,.to.protect.them.from.exposure.to.
weathering.agents.(rain,.hail.and.snow)..
All.boilers.provide.a.standard.antifreeze.
function..
A.single.function.compensator.kit.is.availa-
ble.upon.request:.cod...8101557.
The.kit.is.for.use.on.an.accumulating.boiler.
with. capacity. equal. to. or. greater. than. 80.
litres.
2.1.2 Sequence/cascade boilers
(fig. 4/a)
In.the.event.of.sequence/cascade.installa-
tion,.you.must.modify.for.every.single.boi-
ler.of.the.main.unit.the.following.installing.
parameters:
-.. P AR 1 = 4.
. (for.G20.NATURAL.GAS.boilers)
-.. P AR 1 = 12.
M2
M
x 2
DIP SWITCH
GESTIONE IN CASCATA
CASCADE MANAGEMENT
. (for.G31.PROPANE.boilers)
Refer. to. section. 3.3. to. access. the.
INSTALLER.PARAMETERS.section.
ATTENTION: In sequence/cascade instal-
lations, it is mandatory to arrange the
thermal system with the hydraulic sepa-
rator and safety devices.
The. boiler. is. provided. with. the. board.
RS-485. that. permits. to. manage. up. to. 8.
boilers. in. cascade. and. communication. in.
MODBUS...The.board.is.placed.on.the.back.
of.the.control.panel.
Access. the. board. and. chose. the. desired.
operating.mode.(CASCADE.or.MODBUS).by.
selecting. the. DIP. SWITCH. of. the. board. as.
indicated.in.figure.4/a.
CASCADE mode (fig. 4/b)
Electrically. connect. all. the. boilers. that.
form.the.modular.cascade.thermal.system.
and. set. installer. parameters. PAR. 15. on.
every.single.boiler.as.indicated.in.fig..4/b.
MURELLE HE 35 R
450
340
R3
123
R
170
140
330
60
DIP SWITCH
ON
GESTIONE IN CASCATA
CHIAVE
POLARIZATION
CASCADE MANAGEMENT
1 2 3
CN10
DIP SWITCH
ON
GESTIONE IN MODBUS
MODBUS MANAGEMENT
1 2 3
MURELLE HE 35 R UK
450
C.H..flow
M.
.
R.2".(UNI-ISO.7/1).
C.H..return
R.
.
R.2".(UNI-ISO.7/1)..
M2. D.H.W..tank.flow
.
G.3/4".(UNI-ISO.228/1).
R3. D.H.W..tank.return
.
G.3/4".(UNI-ISO.228/1).
M2
R3
M
R
170
140
330
60
Fig..4
ON
1 2 3
Fig..4/a
340
123
DI
GE
M