the. burner. when. the. temperature. of. the.
water.contained.inside.the.appliance.drops.
to. below. 6°C.. The. anti-freeze. function. is.
ensured,.however,.only.if:
-. the.boiler..is.correctly.connected.to.the.
gas.and.electricity.supply.circuits;
-. the.boiler.is.constantly.fed;
-. the.boiler.ignition.is.not.blocked;
-. the. essential. components. of. the. boiler.
are.all.in.working.order.
In. these. conditions. the. boiler. is. protected.
against. frost. down. to. an. environmental.
temperature.of.-5°C.
ATTENTION:  In  the  case  of  installation 
in  a  place  where  the  temperature  drops 
below  0°C,  the  connection  pipes  must  be 
protected. 
2.2 
CONNECTING UP SYSTEM
To.protect.the.heat.system.from.damaging.
corrosion,. incrustation. or. deposits,. before.
installation. it. is. extremely. important. to.
clean. the. system. using. suitable. products.
such. as,. for. example,. Sentinel X300 (new 
system),  X400  and  X800  (old  system)  or 
Fernox Cleaner F3..Complete.instructions.
are.provided.with.the.products.but,.for.fur-
ther. information,. you. may. directly. contact.
SENTINEL. PERFORMANCE. SOLUTIONS.
LTD.or.FERNOX.COOKSON.ELECTRONICS.
For.long-term.protection.agains.corrosion.
and.deposits,.the.use.of.inhibitors.such.as.
Sentinel  X100  or  Fernox  Protector  F1. is.
recommended. after. cleaning. the. system..
It. is. important. to. check. the. concentration.
of. the. inhibitor. after. each. system. modifi-
cation. and. during. maintenance. following.
the. manufacturer's. instructions. (specific.
tests. are. available. at. your. dealer).. The.
safety. valve. drain. must. be. connected. to. a.
collection. funnel. to. collect. any. discharge.
during.interventions..If.the.heating.system.
is.on.a.higher.floor.than.the.boiler,.install.
the. on/off. taps. supplied. in. kit. optional. on.
the.heating.system.delivery/return.pipes..
WARNING:  Failure  to  clean  the  heat 
system or add an adequate inhibitor inva-
lidates the device's warranty.
Gas. connections. must. be. made. in. accor-
dance. with. current. standards. and. regula-
tions.. When. dimensioning. gas. pipes. from.
the. meter. to. the. module,. both. capacity.
volume. (consumption). in. m
density.must.be.taken.into.account..
The. sections. of. the. piping. making. up. the.
system. must. be. such. as. to. guarantee.
a. supply. of. gas. sufficient. to. cover. the.
maximum. demand,. limiting. pressure. loss.
between.the.gas.meter.and.any.apparatus.
being.used.to.not.greater.than:
–. 1.0. mbar. for. family. II. gases. (natural.
gas);
–. 2.0. mbar. for. family. III. gases. (butane. or.
propane).
8
1
An.adhesive.data.plate.is.sticked.inside.the.
front. panel;. it. contains. all. the. technical.
data. identifying. the. boiler. and. the. type. of.
gas.for.which.the.boiler.is.arranged.
2.2.1 
Connection of condensation 
water trap
2
The.drip.board.and.its.water.trap.must.be.
connected. to. a. civil. drain. through. a. pipe.
with. a. slope. of. at. least. 5. mm. per. metre.
to.ensure.drainage.of.condensation.water..
The  plastic  pipes  normally  used  for  civil 
drains  are  the  only  type  of  pipe  which  is 
8
1
2
KEY
. 1. Ignition.transformer.(TRA)
. 2. Condensate.drain.tap
. 3. Gas.valve
appropriate for conveying condensation to 
the building's sewer pipes.
2.2.2 
The.gas.valve.is.supplied.ex.factory.with.an.
inlet.filter,.which,.however,.is.not.adequate.
to.entrap.all.the.impurities.in.the.gas.or.in.
gas.main.pipes..
To. prevent. malfunctioning. of. the. valve,. or.
in.certain.cases.even.to.cut.out.the.safety.
device. with. which. the. valve. is. equipped,.
3
/h. and. gas.
install.an.adequate.filter.on.the.gas.pipe.
2.3 
The.charge.pressure,.with.the.system.cold,.
must.be.between.1 and 1.5 bar..
The.filling.is.to.be.done.slowly.to.allow.air.
bubbles.to.escape.through.the.air.vents.
2.3.1 
To.drain.the.system,.turn.off.the.boiler.and.
use.the.discharge.valve.(7).
4
2.4 
5
To. set. this. exhaust. configuration,. refer.
6
to. fig.. 6.. The. boiler. is. provided. also. of. a.
rubber. gasket. Ø. 80. to. be. used. as. shown.
in.the.figure.
3
The maximum total length of the exhaust 
pipe ø 80 is determined by the load losses 
of the individual accessories inserted and 
7
must not be more than 15 mm H
4
6
3
7
. 4. Pressure.transducer.(TPA)
. 6. Pump.high.efficiency.(PI)
. 7. Boiler.discharge
. 8. Safety.valve.3.5.bar
Filter on the gas pipe
INITIAL PHASE 
SYSTEM FILLING
System draining (fig. 5)
FORCED EXHAUST 
TYPE B23P - B53P (fig. 6)
O.
2
Fig..5
ES