INSTALLATION
NOTE: Use fittings listed for use in wet conditions and
ensure the opening is above the level of uninsulated live
parts in order to maintain the NEMA 3R rating.
l Mount the back cover to the wall using the appropriate
hardware.
l Install four conductor (Hot/Blue, Hot/Blue, Neutral/
White, Ground/Green-Yellow) permanent wiring into the
junction box.
l Route the wiring through the opening in the exterior wall
and the back cover.
l Connect the wiring to the receptacle.
l Slide the receptacle into the back cover.
l Secure the front cover to the back cover using screws.
FIG. 13
A
A - Receptacle
FIG. 14
12 | English
WIRING THE TRANSFER SWITCH TO THE
LOAD CENTER
See Figures 15 - 20.
DANGER
emergency, immediately shut the power OFF. If
necessary, separate the victim from live conductors
using non-conductive items like a PVC pipe or wooden
broomstick. If the victim is unconscious administer first
aid and get medical assistance immediately. Failure to
act promptly will result in death or serious injury.
DANGER
main circuit breaker in the load center OFF before
connecting circuits to the transfer switch. Contact with
live terminals will result in severe electric shock,
personal injury, and death.
DANGER
breaker in the load center to the OFF position, does
not shut off power on the utility side of the main
breaker. The wires on the utility side are still live
and contact with them can result in serious injury
and death.
WARNING
professional should wire and install transfer
switches. Improper installation can result in death,
serious injury, and equipment or property damage.
FIG. 15
In
case
of
an
Risk of Electrocution. Turn the
Turning
the
main
Only licensed and qualified
electrical
circuit