INSTALLATION
l Neatly route the transfer wires inside the load center's
wiring compartment until they are close to the circuit
breaker.
l Insert the red transfer wires into the circuit breaker and
secure in place by tightening the lugs.
l Twist the ends of one black transfer wire and one hot
wire together. Repeat with second black transfer wire
and hot wire.
l Secure the twisted ends inside wire caps and place the
wires inside the load center's wiring compartment.
l Repeat this process to wire the remaining 240V circuit.
To complete installation:
l Trim and strip the white (neutral) transfer wire and the
green (ground) transfer wire.
l Insert the white (neutral) transfer wire into any unused
hole in the neutral bar and secure in place.
l Insert the green (ground) transfer wire into any unused
hole in the ground bar and secure in place.
NOTE: If the load center does not have a separate
ground bar, connect the green (ground) transfer wire
into an unused hole on the neutral bar.
l Replace the load center cover.
l Place all the circuit selectors in the transfer switch in the
"LINE" position.
l Place all the circuit breakers inside the load center,
including the main circuit breaker, in the ON position.
OPERATION
OPERATING/TESTING
SWITCH
See Figures 21 - 24.
When powering branch circuits using utility power,
the circuit selectors inside the transfer switch should
be in the "LINE" position. Place the circuit selectors
in the "GEN" position to operate branch circuits using
generator power. To remove all power sources, place
the selectors in the "OFF" position (center).
NOTE: You do not have to turn off any of the circuit
breakers in the load center, including the main breaker,
to operate the transfer switch.
To test/operate the transfer switch in the "LINE"
position:
l Make sure that the circuit breakers in the load center,
including the main breaker, are in the ON position.
l Place one or all of the transfer switch's circuit selectors
in the "LINE" position.
l Verify that the branch circuits are receiving utility power
and functioning normally.
l If a problem occurs, turn power off at the load center's
main breaker and contact a qualified electrician.
14 | English
THE
TRANSFER
FIG. 20
A
C
A - Ground Bar
B - Neutral Bar
C - Ground Wire
D - Neutral Wire
FIG. 21
B
D