Descargar Imprimir esta página

Greenlee IPM-400 Manual De Instrucciones página 45

Medidor de proceso industrial

Publicidad

Idiomas disponibles

Idiomas disponibles

Maintenance
• Do not attempt to repair this unit. It contains no user-serviceable parts.
• Do not expose the unit to extremes in temperature or high humidity.
See Specifications.
Failure to observe these precautions can result in injury and can damage the unit.
Battery and Fuse Replacement
Before opening the case, remove the test leads from the circuit and shut off the unit.
Failure to observe this warning can result in severe injury or death.
The fuses are an integral part of the overvoltage protection. When fuse replacement is
necessary, see Specifications for the correct type, size, and capacity. Using any other
type of fuse will void the overvoltage protection rating of the unit.
Failure to observe this warning can result in severe injury or death.
Replacing the Battery
1.
Disconnect the unit from the circuit.
2.
Turn the unit off.
3.
Remove the bottom screw from the back cover.
4.
Remove the back cover.
5.
Replace the batteries (observe polarity).
6.
Taking care to properly align the stand, replace the cover and the screw.
Replacing the Fuses
1.
Remove the battery cover and batteries as described in steps 1 through 4 above.
2.
Remove the four screws from the back of the unit.
3.
Remove the back.
4.
Replace the fuse(s).
5.
Replace the back, batteries, and battery cover.
Cleaning
Periodically wipe the case with a damp cloth and mild detergent; do not use abrasives or
solvents.
All manuals and user guides at all-guides.com
IPM-400
45

Publicidad

loading