●
Loosen screws and remove the sheet metal cover (pos. 1).
Make sure not to damage the grounding cable during this operation. Unscrew
the nut on the grounding cable base and put it away on the sheet metal cover.
The following figure illustrates a top view of the ventilator unit (with the identification
"A" here) and a bottom view of the filtration unit (with the identification "B" here).
●
Remove the sticking tape with which hoses/cables are attached in the filtration
unit.
●
Now connect the grounding cable (pos. 1, B) to the corresponding grounding
screw (pos. 1, A) on the cyclone.
Serial No.: 1502206
Technical modifications without previous notification and errors reserved.
KEMPER CleanAirTower Instruction manual - EN
Figure 4, Removal of sheet metal cover
Figure 5, Location of pneumatic system components
- 67 -
Rev.:
1
Status as of: 05/2014